9dee6cb2

10.4. Removal and installation of the tank and main brake cylinder (MBC)

Components of installation and assembly of GTTs

1 — Collars
2 — GTTs tank Hoses
3 — Laying
4 — the Reception union
5 — the Piston No. 1
6 — the Piston No. 2

7 — Pruzhina
8 — the GTTs Case
9 — the Pin
10 — Consolidation
11 — the Tank
12 — the Filter
13 — the Cover


 PERFORMANCE ORDER

  1. Remove assembly of the air cleaner (see the Head of the Power supply system and production of the fulfilled gases).
  2. Pump out from GTTs brake fluid by means of the syringe or the syringe.
  3. Separate the D/V socket of low level of brake fluid.
  4. Apply adjusting tags on hoses of the GTTs tank and collars, weaken collars and remove hoses from the tank.
  5. Turn out a bolt and remove assembly of the tank of brake fluid.
  6. Apply adjusting tags on hoses of the GTTs tank and collars, weaken collars and remove hoses from GTTs.
  7. Disconnect 2 brake tubes from the tank.
  8. Turn out two nuts and remove GTTs together with laying.
  9. If necessary sort GTTs.
  10. Before installation clear GTTs and the tank compressed air and adjust length of a press rod of the amplifier of brakes (see the Section Removal, check and installation of the amplifier of brakes).
  11. After installation fill the tank with brake fluid, pump over the brake system and check it for leaks.
  12. Adjust a pedal of a working brake (see the Section Check and adjustment of the course of pedals of the working and parking brake).